Welcome to KAMA Auto
Before choosing SKD or CKD supply, a commercial vehicle distributor should agree what arrives in each kit, what work remains at the destination and who will verify the finished vehicle. A supply label alone cannot answer those questions. Use a configuration-specific kit list and a responsibility matrix before committing to an assembly programme.
This guide provides a practical discussion template for importers and local assembly partners. It is not a statement that every KAMA model is available in every supply form. Model eligibility, technical support, documentation and cooperation terms require project-specific confirmation.
CBU generally describes complete built-up vehicle supply. SKD and CKD describe forms of disassembled vehicle supply for local assembly. The extent of disassembly, included assemblies and remaining operations must be defined for the particular project. Do not assume that two suppliers using the same abbreviation are offering identical kit contents.
Compare the proposed supply forms against the local plant's real capabilities. A distributor with vehicle sales and routine servicing experience may still need additional equipment, trained personnel and documented checks for assembly operations. Start with an honest readiness review rather than selecting a label first.
Identify the vehicle model, intended use, steering arrangement, energy type and configuration revision at the top of the kit list. For an electric vehicle, distinguish battery versions and charging interfaces. For a passenger vehicle, identify the agreed seating layout. A cargo van and a passenger minibus should not share an ambiguous specification merely because their exterior bodies look similar.
For every supplied assembly or part group, record:
A consistent item name and part or assembly reference.
The quantity required per vehicle and the quantity in each package.
Its supplied condition: complete assembly, partially assembled or separate components.
The work remaining after arrival and the supporting document revision.
The package identifier and the method for matching it to the relevant vehicle or batch.
Any agreed locally sourced item, stated separately from supplied kit contents.
Keep exclusions visible. Items such as workshop tools, consumables, locally procured components and initial spare parts should have their own agreed scope. Do not treat an unlisted item as included or assume that a spare-parts package is interchangeable with assembly kit contents.
The following is a suggested planning template. Each row needs named owners, a deliverable and a clear review point. It does not assign contractual duties or replace the final technical and commercial agreements.
| Work package | Supplier-side questions | Local partner questions | Evidence to agree |
|---|---|---|---|
| Configuration and kit definition | Which model revision and supplied condition are proposed? | Which destination use and local assembly operations are required? | Approved configuration sheet, kit list and exclusions. |
| Packaging and receiving | How are packages identified and matched to the kit list? | Who checks quantities and visible condition on arrival? | Package index, receiving checklist and discrepancy record. |
| Plant and equipment | What process requirements and documentation can be provided? | Are workspace, tooling, utilities and material handling suitable? | Readiness review and an agreed list of open items. |
| Assembly and training | What instructions and support are within the confirmed scope? | Who performs the work and maintains personnel competence? | Process revision, training scope and completion records. |
| Inspection and release | Which supplied-component records are available? | Who checks assembly results and authorises local release? | Inspection plan, test records and release responsibility. |
| After-sales and parts | How will part identification and technical questions be handled? | Who manages service records and local replacement stock? | Parts catalogue revision, support contacts and issue workflow. |
Review any row where both sides assume the other party owns the task. Separate the person doing the work from the person checking it. Record unresolved items explicitly and close them before the relevant project milestone.
Ask the local team to describe its available floor space, storage, handling equipment, utilities, tools and inspection capability. Include how incoming parts will be protected and how assemblies will be separated by configuration revision. A list of machines alone does not demonstrate that the complete process is ready.
For electric commercial vehicles, discuss high-voltage work boundaries, suitable facilities, competent personnel and approved procedures with the technical teams. A purchasing checklist is not a repair or assembly instruction. Do not improvise a process from photographs or a general product brochure.
Import classification, local assembly eligibility, registration and certification requirements need separate confirmation for the destination and configuration. This article makes no claim that SKD or CKD supply automatically qualifies for a particular policy benefit or market approval.
Before moving to a wider programme, agree the scope and objectives of a pilot batch. Define what must be demonstrated: kit completeness, receiving traceability, assembly-process suitability, finished-vehicle checks and the ability to identify replacement parts.
Keep a short issue log with the affected item, configuration revision, observation, owner, proposed action and closure evidence. If the design, kit contents or process changes, assess which documents and checks need updating. Do not carry an unresolved pilot issue into a larger batch simply because the next shipment is scheduled.
No. Confirm the supplied condition, part groups, quantities and exclusions for the exact project. The abbreviation should be backed by a written kit list.
It can provide a starting point for vehicle configuration, but an assembly project also needs kit contents, remaining operations, plant readiness and inspection responsibilities. Those additional documents should be agreed separately.
Identify assembly kit contents and initial service spare parts separately. Both lists should refer to the same confirmed configuration so that quantities and part references can be checked.
For an initial discussion, provide the destination country, vehicle type, intended use, proposed supply form, planned batch size and a description of your existing plant and technical team. Add a simple list of the assembly operations you expect to perform locally and the support you want to discuss.
See our electric passenger van assembly overview for broader project considerations, or use the first-purchase checklist to organise the initial vehicle requirement. Contact KAMA through the site's enquiry entry to discuss model-specific feasibility and agree the next technical review.
Image: AI-generated conceptual illustration of shipment documentation and review records. It does not depict an actual KAMA shipment, plant or signed cooperation project.